Close Menu
    Facebook X (Twitter) Instagram YouTube
    Advertise with us Sunday, May 18
    Facebook X (Twitter) Instagram
    Platform TimesPlatform Times
    VIDEOS
    • Home
    • News
    • Metro
    • Politics
    • Business
    • Education
    • Health
    • Special Reports
    • Entertainment
    • Sports
    • Interview
    Platform TimesPlatform Times
    • Home
    • News
    • Metro
    • Politics
    • Business
    • Education
    • Health
    • Special Reports
    • Entertainment
    • Sports
    • Interview
    Home»News

    Flood Control: Delta Governor Orders Demolition Of Buildings On Waterways 

    adminBy adminJune 26, 2023 News No Comments4 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    By Onomiguren Agbamu

    Delta State Governor, Rt. Hon. Sheriff Oborevwori has ordered the demolition of all buildings erected along waterways in the State.

    Oborevwori gave the order on Monday, during an inspection tour of Phases I and II of the Warri/Effurun Storm Water Control Projects in Warri South and Uvwie Local Government Areas of the State.

    The Governor said there was no place in the world where people were allowed to build on waterways and directed the Ministries of Housing, Works, and Lands to identify and pull down all such buildings to allow the free flow of water on natural waterways.

    Oborevwori said: “We started the inspection with Phase ll of the stormwater drainage project being handled by CCECC. They have five catchment areas. We have looked at their works and realized that they have done a lot as they have gone very far.

    “They have some obstacles, and we also looked at what is causing the obstacles and got to know that there are some buildings on natural waterways, which are causing obstructions and slowing down the spate of work being done by the construction firm.

    “We also assured the contractors that all the buildings on the waterways, both in phase l and phase ll, will be brought down by the State Government to enable them to finish their work seamlessly.

    “They have assured us that they need 21 days for some of the areas they have opened, that are causing gridlock, to be properly fixed and the drainage crossing Airport Road by Fani Kayode was cast on Saturday, and they need about 19 days for that area to be fixed also.

    “On phase l of the project, there are countless buildings on the waterways, and l have called on the Permanent Secretary in the Ministry of Housing and Works to liaise with the Ministry of Lands to see how those buildings on waterways can be brought down to enable the construction firm to have unfettered access to do their work,” the Governor said.

    On the Warri City Stadium, Governor Oborevwori said he was not satisfied with the work being done by the contractor, adding that he would study the contract to ensure prompt and quality delivery of the project.

    “l came here to see what the contractor handling the project has done, and l am not too satisfied with what the contractor has done.

    “But the contractor said what they are doing is according to the scope of the contract awarded to them. So, we are going to look at the contract and see what can be done to ensure speedy and quality delivery of the project.

    “Some of the areas that are not properly scoped will be rescoped. We want the best for Warri and this is the Warri City Stadium,” he said.

    At Otovwodo Junction, Ughelli, Governor Oborevwori ordered the relocation of Delta Appreciate Park and those trading along the road.

    According to him; “we are planning something there but when you are planning you need to go and see the place and I saw a motor park at that junction and that’s not acceptable at all.

    “Trading on the road is also not acceptable, you can see the risk involved in trading on the express road.

    “Last week we met with His Majesty, the Ovie of Ughelli, the Council Chairman, and the President General, and we discussed all these and that the market needs to be relocated from that place because it’s causing a lot of hardship to travelers.

    “I have directed the Council Chairman to ensure that the motor park is relocated from that place and those trading on the road need to move.

    “There is somewhere we have prepared for them, and we have the issue of the access road, but I have also directed the Ministry of Works to come up with a proposal to enable us to have an access road to the new market.”

    At Isheagu-Ewulu Road and Bridge, in Aniocha South Local Government Area, the Governor expressed satisfaction with the work done by the contractor, assuring that the project would be ready for inauguration in September.

    “I am satisfied with the work done so far and the beauty of this road is that it connects two communities and coming from Isheagu to Ewulu you see the old bridge has collapsed so this new bridge is a saving grace for these two communities.

    “The contractor has assured that by the end of August, the entire bridge and 9.1 km of the road would be due for the inauguration,” he stated.

    Do you want to share a story with us? Do you want to advertise with us? Do you need publicity for a product, service, or event? Contact us on WhatsApp +2348183319097 Email: platformtimes@gmail.com

    We are committed to impactful investigative journalism for human interest and social justice. Your donation will help us tell more stories. Kindly donate any amount HERE

    Pelican Valley
    admin
    • Website

    Platform Times is a trailblazing news website that empowers grassroots communities across Africa by delivering the latest news through engaging multimedia content. By leveraging photos, text, and videos, the site inspires concerned citizens and activists worldwide to take action against critical issues, including corruption, poverty, environmental degradation, and democratic disregard.

    Keep Reading

    Zik Varsity Gets New Acting VC As FG Backs Appointment Process

    Crescent University Hails JAMB Registrar, Oloyede, For Exemplary Leadership

    Troops Neutralise Dozens Of Terrorists, Rescue 146 Victims In One Week – DHQ

    Ogun, Lagos, Delta, Others Lead States In N1.85tn Debt Repayment – NOA

    Tragedy In Delta As 16-Year-Old Accidentally Shoots, Kills Younger Sister

    Tragedy In Kwara: 37 Dead In Boat Mishap Amid Rescue Efforts

    Add A Comment

    Comments are closed.

    The Rehla
    The Rehla'
    Advertisement
    Pelican Valley'
    Advertisement
    Advertisement
    Pelican Valley'

    Platform Times is a trailblazing news website that empowers grassroots communities across Africa by delivering the latest news through engaging multimedia content. By leveraging photos, text, and videos, the site inspires concerned citizens and activists worldwide to take action against critical issues, including corruption, poverty, environmental degradation, and democratic disregard.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    • About Us
    • Advertise
    • Contact Us
    • Disclaimer
    • Download Platform Times app

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Advertise
    • Contact Us
    • Disclaimer
    • Download Platform Times app
    © 2025, All Rights Reserved | Platform Times Newspaper | Powered By CyberWarrior

    Type above and press Enter to search. Press Esc to cancel.